Why CBBRAM, I am glad you asked. I'm gonna run a triple stack from SARMSX, wanna do it for 16 week. On week 13, and therefore last 4 weeks of the SARMS I'll start EQ at 800 mg/week, test at 250 mg/week plus LGD.
It's gonna look something like this:
1-12 proviron 100 mg ed
1-16 mk-2866 25 mg ed
1-16 S-4 50mg ed am/pm split
1-16 GW 501516 20 mg ed pre-workout
13-32 EQ 800 mg/week
13-32 Test C 250 mg /week
17-28 LGD 10 mg ed
13-end of PCT Aromasin 12.5 mg e2d
PCT two weeks after last pin
35-40 MK-2866 25 mg ed, GW 501516 20 mg ed, Clomid 50/50/25/25/25/25, Nolva 40/40/20/20/20/20, Aromasin 12.5 mg e2d